• Long Lead EDC

Long Lead EDC

  • £29.95

  • Ex VAT: £24.96

PRODUCT DESCRIPTION

The Magnum Long Lead EDC is a classic gentleman's and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 8Cr13MoV stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).

Overall Length:18,4 cm

Blade Length:8 cm

Blade Thickness:2,7 mm

Weight:78 g

Blade Material:8Cr13MoV

Handle Material:G10

Opener:Nail Nick

Opening:Manual

Lock Type:Slipjoint

Made in:Asia

Color:Black

You May Also Like...

Please find below a small selection of other items that may be of interest to you.

MUST BE OVER 18 YEARS OLD

PLEASE REMEMBER, we can only supply knives if you are over 18 years old. By ordering from this site, you are confirming that you are over 18 years old.